The Trophy Project Case Study
The ill-fated Trophy Project was in trouble right from the start. Reichart, who had been an assistant project manager, was involved with the project from its conception. When the Trophy Project was accepted by the company, Reichart was assigned as the project manager. The program schedules started to slip from day 1, and expenditures were excessive. Reichart found that the functional manag-ers were charging direct labor time to his project but working on their own pet projects. When he complained of this, he was told not to meddle in the functional manager’s allocation of resources and budgeted expenditures. After approxi-mately six months, Reichart was requested to make a progress report directly to corporate and division staffs.
Reichart took this opportunity to bare his soul. The report substantiated that the project was forecasted to be one complete year behind schedule. Reichart’s staff, as supplied by the line managers, was inadequate to maintain the current pace, let alone make up any time that had already been lost. The estimated cost at completion at this interval showed a cost overrun of at least 20 percent. This was Reichart’s first opportunity to tell his story to people who were in a position to correct the situation. The result of Reichart’s frank, candid evaluation of the Trophy Project was very predictable. Nonbelievers finally saw the light, and line managers realized that they had a role to play in the completion of the project. Most of the problems were now out in the open and could be corrected with ade-quate staffing and resources. Corporate staff ordered immediate remedial action and staff support to provide Reichart a chance to bail out his program.
The results were not at all what Reichart had expected. He no longer reported to the project office; he now reported directly to the operations manager. Corpo-rate staff’s interest in the project became very intense, requiring a 7:00 a.m. meet-ing every Monday for complete review of the project status and plans for recovery. Reichart found himself spending more time preparing paperwork, reports, and projections for his Monday morning meetings than he did administering the Trophy Project. The main concern of corporate was to get the project back on schedule. Reichart spent many hours preparing the recovery plan and establishing manpower requirements to bring the program back onto the original schedule.
Group staff, in order to closely track the progress of the Trophy Project, assigned an assistant program manager. The assistant program manager deter-mined that a sure cure for the Trophy Project would be to computerize the various problems and track the progress through a very complex computer program. Cor-porate provided Reichart with 12 additional staff members to work on the com-puter program. In the meantime, nothing changed. The functional managers still did not provide adequate staff for recovery, as they assumed that the additional manpower Reichart had received from corporate would accomplish that task.
After approximately $50,000 was spent on the computer program to track the problems, it was found that the computer could not handle the program objectives. Reichart discussed this problem with a computer supplier and found that $15,000 more was required for programming and additional storage capacity. It would take two months for installation of the additional storage capacity and completion of the programming. At this point, the decision was made to abandon the computer program.
Reichart was now a year and a half into the program with no prototype units completed. The program was still nine months behind schedule with the overrun projected at 40 percent of budget. The customer had been receiving reports on a timely basis and was well aware that the Trophy Project was behind schedule. Reichart had spent a great deal of time with the customer explaining the problems and the plan for recovery. Another problem that Reichart had to contend with was that the vendors who were supplying components for the project were also run-ning behind schedule.
One Sunday morning, while Reichart was in his office putting together a report for the client, a corporate vice president came in. “Reichart,” he said, “in any project I look at the top sheet of paper, and the man whose name appears at the top of the sheet is the one I hold responsible. For this project, your name appears at the top of the sheet. If you cannot bail this thing out, you are in serious trouble in this corporation.” Reichart did not know which way to turn or what to say. He had no control over the functional managers who were creating the problems, but he was the person who was being held responsible.
After another three months, the customer, becoming impatient, realized that the Trophy Project was in serious trouble and requested that the division general
manager and his entire staff visit the customer’s plant to give a progress and get-well report within a week. The division general manager called Reichart into his office and said, “Reichart, go visit our customer. Take three or four functional line people with you and try to placate him with whatever you feel is necessary.” Reichart and four functional line people visited the customer and gave a four-and-a-half-hour presentation defining the problems and the progress to that point. The customer was very polite and even commented that it was an excellent presenta-tion, but the content was totally unacceptable. The program was still six to eight months late, and the customer demanded progress reports on a weekly basis. The customer made arrangements to assign a representative in Reichart’s department to be on-site at the project on a daily basis and to interface with Reichart and his staff as required. After this turn of events, the program became very hectic.
The customer representative demanded constant updates and problem iden-tification and then became involved in attempting to solve these problems. This involvement created many changes in the program and the product in order to eliminate some of the problems. Reichart had trouble with the customer and did not agree with the changes in the program. He expressed his disagreement vocally when, in many cases, the customer felt the changes were at no cost. This caused a deterioration of the relationship between client and producer.
One morning Reichart was called into the division general manager’s office and introduced to Mr. “Red” Baron. Reichart was told to turn over the reins of the Trophy Project to Red immediately. “Reichart, you will be temporarily reassigned to some other division within the corporation. I suggest you start looking outside the company for another job.” Reichart looked at Red and asked, “Who did this? Who shot me down?”
Red was program manager on the Trophy Project for approximately six months, after which, by mutual agreement, he was replaced by a third project manager. The customer reassigned his local program manager to another project. With the new team, the Trophy Project was finally completed one year behind schedule and at a 40 percent cost overrun.
QUESTIONS
Did the project appear to be planned correctly?
Did functional management seem to be committed to the project?
Did senior management appear supportive and committed?
Can a single methodology for project management be designed to force coopera-tion to occur between groups?
Is it possible or even desirable for strategic planning for project management to include ways to improve cooperation and working relationships, or is this beyond the scope of strategic planning for project management?
RUBRIC
QUALITY OF RESPONSE NO RESPONSE POOR / UNSATISFACTORY SATISFACTORY GOOD EXCELLENT Content (worth a maximum of 50% of the total points) Zero points: Student failed to submit the final paper. 20 points out of 50: The essay illustrates poor understanding of the relevant material by failing to address or incorrectly addressing the relevant content; failing to identify or inaccurately explaining/defining key concepts/ideas; ignoring or incorrectly explaining key points/claims and the reasoning behind them; and/or incorrectly or inappropriately using terminology; and elements of the response are lacking. 30 points out of 50: The essay illustrates a rudimentary understanding of the relevant material by mentioning but not full explaining the relevant content; identifying some of the key concepts/ideas though failing to fully or accurately explain many of them; using terminology, though sometimes inaccurately or inappropriately; and/or incorporating some key claims/points but failing to explain the reasoning behind them or doing so inaccurately. Elements of the required response may also be lacking. 40 points out of 50: The essay illustrates solid understanding of the relevant material by correctly addressing most of the relevant content; identifying and explaining most of the key concepts/ideas; using correct terminology; explaining the reasoning behind most of the key points/claims; and/or where necessary or useful, substantiating some points with accurate examples. The answer is complete. 50 points: The essay illustrates exemplary understanding of the relevant material by thoroughly and correctly addressing the relevant content; identifying and explaining all of the key concepts/ideas; using correct terminology explaining the reasoning behind key points/claims and substantiating, as necessary/useful, points with several accurate and illuminating examples. No aspects of the required answer are missing. Use of Sources (worth a maximum of 20% of the total points). Zero points: Student failed to include citations and/or references. Or the student failed to submit a final paper. 5 out 20 points: Sources are seldom cited to support statements and/or format of citations are not recognizable as APA 6th Edition format. There are major errors in the formation of the references and citations. And/or there is a major reliance on highly questionable. The Student fails to provide an adequate synthesis of research collected for the paper. 10 out 20 points: References to scholarly sources are occasionally given; many statements seem unsubstantiated. Frequent errors in APA 6th Edition format, leaving the reader confused about the source of the information. There are significant errors of the formation in the references and citations. And/or there is a significant use of highly questionable sources. 15 out 20 points: Credible Scholarly sources are used effectively support claims and are, for the most part, clear and fairly represented. APA 6th Edition is used with only a few minor errors. There are minor errors in reference and/or citations. And/or there is some use of questionable sources. 20 points: Credible scholarly sources are used to give compelling evidence to support claims and are clearly and fairly represented. APA 6th Edition format is used accurately and consistently. The student uses above the maximum required references in the development of the assignment. Grammar (worth maximum of 20% of total points) Zero points: Student failed to submit the final paper. 5 points out of 20: The paper does not communicate ideas/points clearly due to inappropriate use of terminology and vague language; thoughts and sentences are disjointed or incomprehensible; organization lacking; and/or numerous grammatical, spelling/punctuation errors 10 points out 20: The paper is often unclear and difficult to follow due to some inappropriate terminology and/or vague language; ideas may be fragmented, wandering and/or repetitive; poor organization; and/or some grammatical, spelling, punctuation errors 15 points out of 20: The paper is mostly clear as a result of appropriate use of terminology and minimal vagueness; no tangents and no repetition; fairly good organization; almost perfect grammar, spelling, punctuation, and word usage. 20 points: The paper is clear, concise, and a pleasure to read as a result of appropriate and precise use of terminology; total coherence of thoughts and presentation and logical organization; and the essay is error free. Structure of the Paper (worth 10% of total points) Zero points: Student failed to submit the final paper. 3 points out of 10: Student needs to develop better formatting skills. The paper omits significant structural elements required for and APA 6th edition paper. Formatting of the paper has major flaws. The paper does not conform to APA 6th edition requirements whatsoever. 5 points out of 10: Appearance of final paper demonstrates the student’s limited ability to format the paper. There are significant errors in formatting and/or the total omission of major components of an APA 6th edition paper. They can include the omission of the cover page, abstract, and page numbers. Additionally the page has major formatting issues with spacing or paragraph formation. Font size might not conform to size requirements. The student also significantly writes too large or too short of and paper 7 points out of 10: Research paper presents an above-average use of formatting skills. The paper has slight errors within the paper. This can include small errors or omissions with the cover page, abstract, page number, and headers. There could be also slight formatting issues with the document spacing or the font Additionally the paper might slightly exceed or undershoot the specific number of required written pages for the assignment. 10 points: Student provides a high-caliber, formatted paper. This includes an APA 6th edition cover page, abstract, page number, headers and is double spaced in 12’ Times Roman Font. Additionally, the paper conforms to the specific number of required written pages and neither goes over or under the specified length of the paper. GET THIS PROJECT NOW BY CLICKING ON THIS LINK TO PLACE THE ORDER
CLICK ON THE LINK HERE: https://www.perfectacademic.com/orders/ordernow
Do You Have Any Other Essay/Assignment/Class Project/Homework Related to this? Click Here Now [CLICK ME] and Have It Done by Our PhD Qualified Writers!!