Greyson Corporation was formed in 1970 by three scientists from the Univer-sity of California. The major purpose of the company was research and develop-ment for advanced military weaponry. Following World War II, Greyson became a leader in the field of research and development. By the mid-1980s, Greyson employed over 200 scientists and engineers.
The fact that Greyson handled only research and development (R&D) con-tracts was advantageous. First of all, all of the scientists and engineers were dedicated to R&D activities; they did not have to share their loyalties with pro-duction programs. Second, a strong functional organization was established. The project management function was the responsibility of the functional manager whose department would perform the majority of the work. Working relationships between departments were excellent.
By the late 1980s, Greyson was under new management. Almost all R&D programs called for establishment of qualification and production planning. As a result, Greyson decided to enter into the production of military weapons as well and capture some of the windfall profits of the production market. This required a major reorganization from a functional to a matrix structure. Personnel problems occurred, but none that proved a major catastrophe.
In 1994, Greyson entered into the aerospace market with the acquisition of a subcontract for the propulsion unit of the Hercules missile. The contract was projected at $200 million over a five-year period, with excellent possibilities for
follow-on work. Between 1994 and 1998, Greyson developed a competent techni-cal staff composed mainly of young, untested college graduates. The majority of the original employees who were still there were in managerial positions. Greyson never had any layoffs. In addition, Greyson had excellent career development pro-grams for almost all employees.
Between 1997 and 2001, the Department of Defense procurement for new weapons systems was on the decline. Greyson relied heavily on their two major production programs, Hercules and Condor II, both of which gave great promise for continued procurement. Greyson also had some 30hirty smaller R&D con-tracts as well as two smaller production contracts for hand weapons.
Because R&D money was becoming scarce, Greyson’s management decided
to phase out many of the R&D activities and replace them with lucrative production contracts. Greyson believed that it could compete with anyone in regard to low-cost production. Under this philosophy, the R&D community was reduced to min-imum levels necessary to support in-house activities. The director of engineering froze all hiring except for job shoppers with special talents. All nonessential engi-neering personnel were transferred to production units.
In 2002, Greyson entered into competition with Cameron Aerospace Cor-poration for development, qualification, and testing of the Navy’s new Neptune missile. The competition was an eight-motor shoot-off during the last 10 months of 2003. Cameron Corporation won the contract owing to technical merit. Grey-son Corporation, however, had gained valuable technical information in rocket motor development and testing. The loss of the Neptune Program made it clear to Greyson’s management that aerospace technology was changing too fast for Greyson to maintain a passive position. Even though funding was limited, Grey-son increased its technical staff and soon found great success in winning R&D contracts.
By 2005, Greyson had developed a solid aerospace business base. Profits had increased by 30 percent. Greyson Corporation expanded from a company with 200 employees in 1994 to 1,800 employees in 2005. The Hercules Program, which began in 1994, was providing yearly follow-on contracts. All indications projected a continuation of the Hercules Program through 2002.
Cameron Corporation, in contrast, had found 2005 a difficult year. The Neptune Program was the only major contract that it maintained. The current production buy for the Neptune missile was scheduled for completion in August 2005 with no follow-on work earlier than January 2006. Cameron Corporation anticipated that overhead rates would increase sharply prior to next buy. The cost per motor would increase from $55,000 to $75,000 for a January procurement, $85,000 for a March procurement, and $125,000 for an August procurement. In February 2005, the Navy asked Greyson Corporation if it would be interested in submitting a sole-source bid for production and qualification of the Neptune mis-sile. The Navy considered Cameron’s position uncertain and wanted to maintain a
qualified vendor should Cameron Corporation decide to get out of the aerospace business.
Greyson submitted a bid of $30 million for qualification and testing of 30 Neptune motors over a 30-month period beginning in January 2006. Current testing of the Neptune missile indicated that the minimum motor age life would extend through January 2009. This meant that production funds over the next 30 months could be diverted toward requalification of a new vendor, and production requirements for 2009 still could be met.
In August 2005, on delivery of the last Neptune rocket to the Navy, Cameron Corporation announced that without an immediate production contract for Nep-tune follow-on work, it would close its doors and get out of the aerospace busi-ness. Cameron invited Greyson Corporation to interview all of its key employees for possible work on the Neptune Requalification Program. Greyson hired 35 of Cameron’s key people to begin work in October 2005. The key people would be assigned to ongoing Greyson programs to become familiar with Greyson meth-ods. Greyson’s lower-level management was very unhappy about bringing in these employees for fear that they would be placed in slots that could have resulted in promotions for some of Greyson’s people. Management then decreed that these 35 people would work solely on the Neptune Program, and other vacancies would be filled, as required, from the Hercules and Condor II programs. Greyson esti-mated that the cost of employing these 35 people was approximately $150,000 per month, almost all of which was being absorbed through overhead. Without these 35 people, Greyson did not believe that it would have won the contract as sole-source procurement. Other competitors could have grabbed these key people and forced an open-bidding situation.
Because of the increased overhead rate, Greyson maintained a minimum staff to prepare for contract negotiations and document preparation. To minimize costs, the directors of engineering and program management gave the Neptune program office the authority to make decisions for departments and divisions that were without representation in the program office. Top management had complete con-fidence in the program office personnel because of their past performance on other programs and years of experience.
In December 2005, the Department of Defense announced that spending was being curtailed sharply and that funding limitations made it impossible to begin the qualification program before July 2006. To make matters worse, consideration was being made for a compression of the requalification program to 25 motors in a 20-month period. However, long-lead funding for raw materials would be available.
After lengthy consideration, Greyson decided to maintain its current position and retain the 35 Cameron employees by assigning them to in-house programs. The Neptune program office was still maintained for preparations to support con-tract negotiations, rescheduling of activities for a shorter program, and long-lead procurement.
In May 2006, contract negotiations began between the Navy and Greyson. At the beginning of contract negotiations, the Navy stated the three key elements for negotiations:
Maximum funding was limited to the 2005 quote for a 30-motor/30-month program.
The amount of money available for the last six months of 2006 was lim-ited to $3.7 million.
The contract would be cost plus incentive fee.
After three weeks of negotiations there appeared a stalemate. The Navy con-tended that the production man-hours in the proposal were at the wrong level on the learning curves. It was further argued that Greyson should be a lot “smarter” now because of the 35 Cameron employees and because of experience learned during the 2001 shoot-off with Cameron Corporation during the initial stages of the Neptune Program.
Since the negotiation teams could not agree, top-level management of the Navy and Greyson Corporation met to iron out the differences. An agreement was finally reached on a figure of $28.5 million. This was $1.5 million below Greyson’s original estimate to do the work. Management, however, felt that, by tightening their belts, the work could be accomplished within budget.
The program began on July 1, 2006, with the distribution of the department budgets by the program office. Almost all of the department managers were furi-ous. Not only were the budgets below their original estimates, but the 35 Cameron employees were earning salaries above the department mean salary, thus reducing total man-hours even further. Almost all department managers asserted that cost overruns would be the responsibility of the program office and not the individual departments.
By November 2006, Greyson was in trouble. The Neptune Program was on target for cost but 35 percent behind for work completion. Department managers refused to take responsibility for certain tasks that were usually considered to be joint department responsibilities. Poor communication between program office and department managers provided additional discouragement. Department man-agers refused to have their employees work on Sunday.
Even with all this, program management felt that catch-up was still possible. The 35 former Cameron employees were performing commendable work equal to their counterparts on other programs. Management considered that the potential cost overrun situation was not in the critical stage and that more time should be permitted before considering corporate funding.
In December 2006, the Department of Defense announced that there would be no further buys of the Hercules missile. This announcement was a severe blow to Greyson’s management. Not only was the company in danger of having to
lay off 500 employees, but overhead rates would rise considerably. There was an indication last year that there would be no further buys, but management did not consider the indications positive enough to require corporate strategy changes.
Although Greyson was not unionized, there was a possibility of a massive strike if Greyson career employees were not given seniority over the 35 former Cameron employees in the case of layoffs.
By February 2007, the cost situation was clear:
The higher overhead rates threatened to increase total program costs by $1 million on the Neptune Program.
Because the activities were behind schedule, the catch-up phases would have to be made in a higher salary and overhead rate quarter, thus in-creasing total costs further.
Inventory costs were increasing. Items purchased during long-lead fund-ing were approaching shelf-life limits. Cost impact might be as high as $1 million.
The vice president and general manager considered the Neptune Program critical to the success and survival of Greyson Corporation. The directors and division heads were ordered to take charge of the program. The following options were considered:
Perform overtime work to get back on schedule.
Delay program activities in hopes that the Navy can come up with ad-ditional funding.
Review current material specifications in order to increase material shelf life, thus lowering inventory and procurement costs.
Begin laying off noncritical employees.
Purchase additional tooling and equipment (at corporate expense) so that schedule requirements could be met on target.
On March 1, 2007, Greyson gave merit salary increases to the key employees on all in-house programs. At the same time, Greyson laid off 700 employees, some of whom were seasoned veterans. By March 15, Greyson employees formed a union and went out on strike.
QUESTIONS
What are the critical issues in the case?
How would you resolve each issue?
RUBRIC
QUALITY OF RESPONSE NO RESPONSE POOR / UNSATISFACTORY SATISFACTORY GOOD EXCELLENT Content (worth a maximum of 50% of the total points) Zero points: Student failed to submit the final paper. 20 points out of 50: The essay illustrates poor understanding of the relevant material by failing to address or incorrectly addressing the relevant content; failing to identify or inaccurately explaining/defining key concepts/ideas; ignoring or incorrectly explaining key points/claims and the reasoning behind them; and/or incorrectly or inappropriately using terminology; and elements of the response are lacking. 30 points out of 50: The essay illustrates a rudimentary understanding of the relevant material by mentioning but not full explaining the relevant content; identifying some of the key concepts/ideas though failing to fully or accurately explain many of them; using terminology, though sometimes inaccurately or inappropriately; and/or incorporating some key claims/points but failing to explain the reasoning behind them or doing so inaccurately. Elements of the required response may also be lacking. 40 points out of 50: The essay illustrates solid understanding of the relevant material by correctly addressing most of the relevant content; identifying and explaining most of the key concepts/ideas; using correct terminology; explaining the reasoning behind most of the key points/claims; and/or where necessary or useful, substantiating some points with accurate examples. The answer is complete. 50 points: The essay illustrates exemplary understanding of the relevant material by thoroughly and correctly addressing the relevant content; identifying and explaining all of the key concepts/ideas; using correct terminology explaining the reasoning behind key points/claims and substantiating, as necessary/useful, points with several accurate and illuminating examples. No aspects of the required answer are missing. Use of Sources (worth a maximum of 20% of the total points). Zero points: Student failed to include citations and/or references. Or the student failed to submit a final paper. 5 out 20 points: Sources are seldom cited to support statements and/or format of citations are not recognizable as APA 6th Edition format. There are major errors in the formation of the references and citations. And/or there is a major reliance on highly questionable. The Student fails to provide an adequate synthesis of research collected for the paper. 10 out 20 points: References to scholarly sources are occasionally given; many statements seem unsubstantiated. Frequent errors in APA 6th Edition format, leaving the reader confused about the source of the information. There are significant errors of the formation in the references and citations. And/or there is a significant use of highly questionable sources. 15 out 20 points: Credible Scholarly sources are used effectively support claims and are, for the most part, clear and fairly represented. APA 6th Edition is used with only a few minor errors. There are minor errors in reference and/or citations. And/or there is some use of questionable sources. 20 points: Credible scholarly sources are used to give compelling evidence to support claims and are clearly and fairly represented. APA 6th Edition format is used accurately and consistently. The student uses above the maximum required references in the development of the assignment. Grammar (worth maximum of 20% of total points) Zero points: Student failed to submit the final paper. 5 points out of 20: The paper does not communicate ideas/points clearly due to inappropriate use of terminology and vague language; thoughts and sentences are disjointed or incomprehensible; organization lacking; and/or numerous grammatical, spelling/punctuation errors 10 points out 20: The paper is often unclear and difficult to follow due to some inappropriate terminology and/or vague language; ideas may be fragmented, wandering and/or repetitive; poor organization; and/or some grammatical, spelling, punctuation errors 15 points out of 20: The paper is mostly clear as a result of appropriate use of terminology and minimal vagueness; no tangents and no repetition; fairly good organization; almost perfect grammar, spelling, punctuation, and word usage. 20 points: The paper is clear, concise, and a pleasure to read as a result of appropriate and precise use of terminology; total coherence of thoughts and presentation and logical organization; and the essay is error free. Structure of the Paper (worth 10% of total points) Zero points: Student failed to submit the final paper. 3 points out of 10: Student needs to develop better formatting skills. The paper omits significant structural elements required for and APA 6th edition paper. Formatting of the paper has major flaws. The paper does not conform to APA 6th edition requirements whatsoever. 5 points out of 10: Appearance of final paper demonstrates the student’s limited ability to format the paper. There are significant errors in formatting and/or the total omission of major components of an APA 6th edition paper. They can include the omission of the cover page, abstract, and page numbers. Additionally the page has major formatting issues with spacing or paragraph formation. Font size might not conform to size requirements. The student also significantly writes too large or too short of and paper 7 points out of 10: Research paper presents an above-average use of formatting skills. The paper has slight errors within the paper. This can include small errors or omissions with the cover page, abstract, page number, and headers. There could be also slight formatting issues with the document spacing or the font Additionally the paper might slightly exceed or undershoot the specific number of required written pages for the assignment. 10 points: Student provides a high-caliber, formatted paper. This includes an APA 6th edition cover page, abstract, page number, headers and is double spaced in 12’ Times Roman Font. Additionally, the paper conforms to the specific number of required written pages and neither goes over or under the specified length of the paper. GET THIS PROJECT NOW BY CLICKING ON THIS LINK TO PLACE THE ORDER
CLICK ON THE LINK HERE: https://www.perfectacademic.com/orders/ordernow
Do You Have Any Other Essay/Assignment/Class Project/Homework Related to this? Click Here Now [CLICK ME] and Have It Done by Our PhD Qualified Writers!!